Put together the Strong Back using 2x6's and 2x4's. Andrew let me borrow his rotating laser level and I used my speed square to level out the entire length of the 2x6's. Everything was screwed and glued, including attaching the supports to the concrete floor using construction adhesive. This makes sure that the Strong Back does not move for the duration of the build. The same framework will support the construction of the outer floats and the main hull.
Friday, November 2, 2007
Building Strong Back
Put together the Strong Back using 2x6's and 2x4's. Andrew let me borrow his rotating laser level and I used my speed square to level out the entire length of the 2x6's. Everything was screwed and glued, including attaching the supports to the concrete floor using construction adhesive. This makes sure that the Strong Back does not move for the duration of the build. The same framework will support the construction of the outer floats and the main hull.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment